Capital Improvement Projects
The Capital Improvement Plan is a short-range plan, usually four to six years, which identifies capital projects and equipment purchases. Grove City has a focus on preserving infrastructure while ensuring the efficient use of public funds. City Council has reviewed the list and will continue to appropriate funds as the projects materialize. If you have questions about any of these projects, please call the Grove City Service Department at 614-277-1100.
These were the Capital Improvement Projects undertaken in 2009.
-
Traffic Signal Improvement for Gantz Road and Ohio Drive - This project will add a traffic signal at the intersection of Gantz Road and Ohio Drive to improve the flow of traffic throughout this area.
-
Traffic Signal Improvements for Buckeye Parkway and Holton Road - This project will add a traffic signal at the intersection of Buckeye Parkway and Holton Road to improve the flow of traffic throughout this area.
-
Tanglebrook Street Lighting, Phase 1 - The first of a two-phase project, this improvement will add decorative street lighting along Demorest Road in the Tanglebrook Subdivision. The follow-up phase will complete the lighting addition within this subdivision.
-
Hoover/Knapp Sanitary Sewer Evaluation Survey - This study will include a full survey, condition inspection and operation evaluation of the existing sanitary system in the area bounded by Columbus Street to the north, Hoover Road to the east, Eugene Avenue to the south, and Joyce Road to the west.
-
System-Wide Flow Monitoring - This project will satisfy an Ohio Environmental Protection Agency requirement, by monitoring the flow and evaluating the capacity of the City's sanitary sewer infrastructure.
-
Republican Run Sanitary Sewer Evaluation Survey - This study will include a survey, inspection and hydraulic model of the Republican Run sewer shed.
-
Haughn Road/Fryer Park Sanitary Sewer Extension - This project will extend a sanitary sewer along Haughn Road from the intersection of SR 665 into Fryer Park on the City's southwest side.
-
Grove City Road Reconstruction - This project will include the full depth reconstruction and widening of Grove City Road from Front Street to the alley west of Elm Street. The project will include storm and sanitary sewer extensions, street lighting, and leisure paths.
-
Security Drive Waterline Replacement - This project consists of the replacement of approximately 600' of existing 6" waterline along Security Drive, from La Rosa Drive to Evans Drive, with 8" waterline.
-
Brookpark Circle Waterline Replacement - This project consists of the replacement of approximately 1000' of existing 6" waterline along Brookpark Circle, with 8" waterline.
-
Big Run Water Tank - This project will add one million gallons of water storage capacity into the City's water distribution system by constructing a new elevated water tank on the City's southwest side.
-
Haughn Road/Fryer Park 16" Water Main - This project will establish a connection between two existing water mains on Orders Road and London-Groveport Road and the proposed Big Run Water Tank.
-
Haughn Road Relocation - This project is Phase 2 of the I-71 and SR 665 interchange improvements. It will add a connection between existing Haughn Road and Gateway West Drive to eliminate the intersection of Haughn Road and SR 665, which is required as part of the interchange upgrade.
-
Roadway Improvements for McDowell Road - This project will add a right-hand turn lane from southbound McDowell Road to westbound Stringtown Road.
-
White Road and McDowell Road Intersection Improvements - This County project will include the addition of traffic signals and turn lanes on White Road to improve the flow of traffic throughout this area.
-
Windsor Park Improvements, Phase 1 - This project will include an entrance to the park from Broadway and the construction of an additional parking lot and bike path/trail improvements.
-
West Grove Bike Path - This project will add bike path / trial connectivity between the West Grove subdivision and the City's Historic Town Center.